2.4.2.7. Check of the additional starting arrangement

Check of a gap "And" between edges of a plunger and an opening of an aktyuator of the additional starting arrangement

1 — the adjusting screw


 PERFORMANCE ORDER

  1. Check a gap "And" between edges of a plunger and an opening of an aktyuator of the additional starting arrangement at a temperature of cooling liquid of 20 °C which has to be within 2,0 — 2,2 mm.
  2. If the size does not correspond to demanded, adjust it the screw 1, previously having shipped an aktyuator of the additional starting arrangement in a tank with the water heated to 20 °C.