- Put two wooden whetstones on forward and back speak rapidly laying.
- Ask the assistant to insert a chain through an opening in a head of cylinders and you hold the right guide of a chain inside, then lower a head of cylinders on wooden whetstones.
- Remove forward whetstone and lower a head of cylinders on a pin, then in the same way lower a back part of a head on a back pin.
- Dip head bolts into oil and insert them into place together with washers.
|
- Evenly tighten bolts in three or four receptions the specified moment in the sequence shown in the drawing.
|
|
- Be convinced of free rotation of both camshafts.
- Establish a side guide in a head of cylinders and combine openings then establish the fixing pins by means of the hammer, monitoring the correct provision of a chain.
- By means of a piece of a wire lower the directing asterisk in gearing with a chain. Grease an axis of the bearing and insert it into an asterisk by means of the hammer. Remove a wire.
- Insert and tighten a cover stopper. Put new laying if it is necessary.
- Shift camshafts back and put asterisks and pro-rates; be convinced that the chain reached the correct position.
|
- Insert bolts with expansion plugs into camshafts and tighten them by hand.
|
|
- Make sure that VMT tag on a damper of tortional fluctuations is combined with an arrow of the index of phases of gas distribution and that VMT tags on distributive gear wheels and a casing of the camshaft are also combined.
|
- Install the top directing core in the bearing of the camshaft and hammer hairpins with the hammer.
|
- Having inserted a metal bar into an opening of a natyazhitel of a distributive chain, drown the directing core to pull a chain, then double-check combination of tags of VMT.
|
- Of early modifications have to be sorted and adjusted by Natyazhiteli. Do not tighten completely a spring tension stopper, be limited to one-two turns. On later designs sort a natyazhitel, then collect him in installation time.
|
- Put to the place of a detail of a natyazhitel and tighten traffic jams and an external ring.
|
- Turn a bent shaft on two whole revolutions and check combination of tags of VMT.
|
- At work serially on everyone distributive to a shaft block an asterisk by means of the metal bar passed in one of openings and tighten a bolt.
|
|
- Put a radiator if it is demanded by a design.
- At serial installation of valves turn a bent shaft so that the top of a ledge of a cam was directed up, dip a pusher of a cam into oil and establish it, wringing out the valve down. Hook on a spring for a collar and pull over a cam pusher by means of the screw-driver.
- Adjust gaps of valves.
- Put a valvate cover with new laying and tighten nuts.
- Put a thermostat casing with new laying and tighten bolts.
- Put perepuskny a hose from the water pump to a casing of the thermostat and tighten collars.
- Establish a tube of return of oil with new laying and tighten a bolt.
- Put forward covers with new laying and tighten bolts.
- If it is demanded by a design, install the compressor and a hydraulic pump.
|